Synergy Rail was contracted by Network Rail from GRIP 3 stage to develop and deliver a comprehensive System Assurance Service for the NR Western Trackside ETCS Level 2 Project. This included assuring the technical compliance of the ETCS system delivered by Alstom and its safe integration with the rest of the railway, covering CSM, ROGS, and RIR compliance.

Client: Network Rail

Date: 2015 - 2025

Activities & Deliverables

The Synergy Rail team established an efficient and effective methodology to independently assure the technical compliance of the system delivered by Alstom, including Safety Verification, Interoperability Authorization and Product Acceptance and obtained APIS and NRAP approval to successfully commission in November 2023.

  • System Safety Development & CSM Compliance
  • Interoperability Compliance Management
  • Product Compliance Verification and Acceptance
  • Technical Compliance
  • Assurance for the integration of ETCS with CBTC interface and ETCS with conventional signaling changes with train detection and interlocking at stage B
  • Hazard Management and Safety Analysis
  • Witnessing Alstom Validation Testing and reviewing test results
  • Liaison with Assessment Body (AsBo), Independent Safety Assessment (ISA) and obtain Safety Acceptance Report and NoBo/DeBo

Clients

Clients & Associates